south city already partly occupied - 25/06/2010
South City
, near the Brussels South railway station, consists of various office buildings and a hotel. The Fonsny-office building has been completed and occupied in the beginning of 2010, and the Broodthaers-office building will be completed in October. To conclude, the hotel will be completed in the beginning of 2011. The entire block of buildings adds to the international aura of the Brussels South district, where the railway station is an important intersection for the national and international rail transport.
|
| vk engineering wins with the infrax-building the public award of the 2020challenge-award - 20/11/2009
The new Infrax-building, recently occupied, received yesterday evening the public award for most innovative building of 2009. The numerous innovative solutions, integrated by the design team CrepainBinst - VK ENGINEERING, make of this building an example of energy-efficiency and sustainability ... more
|
| vk engineering responsible for green mobistar-headquarters - 6/10/2009
Mobistar has moved into its new headquarters in the Da Vinci industrial park in Evere. VK ENGINEERING took care of the building services, with the necessary emphasis on sustainable development. An E-level of E80 is obtained thanks to the application of several energy-efficient measures. In addition, the project had to ... more
|
| the capital : vk engineering takes care of the technical concept - 26/08/2009
At the heart of the European district, the project 'The Capital' is being finalised. The immense offices project of 60.000 sqm, within a stone's throw of the Berlaymont building, is unique because of its location and the modular construction concept, consisting of 6 independent building elements. The 6 elements ware named after ... more
|
| renson honored for green good design - 19/08/2009
On its annual list of Green Good Design for environmentally-friendly projects, the Chicago Athenaeum has admitted the Renson-building. The main office of Renson along the E17-motorway, a collaboration between Crepain-Binst Architecture and VK ENGINEERING, remains a prominent project in the growing trend towards sustainability ... more
|
| new offices references in brussels are ready for use - 2/07/2009
Brussels has two new/renovated office references. Zenith and Le Marquis were surrendered last month with ample attention from the press. VK ENGINEERING was responsable for the building services of both projects ... more
|
| new mobistar head office will deliver outstanding energy performance - 13/10/2008
The first brick was laid on 24 September 2008 at the ‘Sirius’ building that will house the new head office of Belgian mobile operator Mobistar from the second half of 2009. The building will be put up in record time by Banimmo and will stand out for its exceptional performance in terms of energy and comfort. Architects Assar and VK ENGINEERING ... more
|
| belmont court wins mipim-award 2007 - 21/03/2007
The Belmont Court building in Brussels (architect Architectes Associés) won the MIPIM award for 2007 in the Refurbished Office Buildings category. This is the third project for which VK ENGINEERING is carrying out studies that has won an MIPIM award. Previously, the Novalis Residence (2000, architect Assar) and the Mondriaan building ... more
|
| mondriaan best business center on mipim awards 2005 - 11/03/2005
The Mondriaan office building was yesterday evening declared 2004’s best international business centre at MIPIM, the world's premier real estate fair. The award was the jewel in the crown for the work of the design firms involved in this remarkable renovation, namely Assar (architecture) and VK ENGINEERING (building services and civil & structural engineering) ... more
|
|