Your browser is not supported, switch to a different one for an optimal experience.

Komet

Location Mechelen, Belgium
Timeline 2015 - 2024

brownfield development of a new mixed-use town area

Intro

On a former industrial site, a new urban district is emerging with attention to greenery and sustainable development in all areas. VK is carrying out the engineering for this nZEB district, which has the ambition to go "full electric" with the help of renewable energy and applications that are economical with the available energy.

Read more
Client(s)
  • Re-vive
Architects
  • CrepainBinst Architecture
  • BRUT Architecture & Urbanism
  • Areal
Stats
40000 m²
216 apartments
52 senior apartments
46 houses
475 parking places

Story

The ambition is to become "full electric" by using solar panels and individual heat pumps per unit.

Visual mixed mechelen komet BINST ARCHITECTS 1537 MEZO r 18 2000x0 c default website

The former Comet factory in Mechelen will make way for the new Komet district, with 46 houses, 216 apartments, 52 senior apartments and facilities such as a crèche, neighbourhood shop, catering and service centre around a central neighbourhood park.

The new urban district will be built on top of several underground car parks with a total capacity of 475 parking spaces. This is a brownfield development with a total area of 40,000 m². Re-Vive is the project developer.

The major asset of the master plan is its sustainable character at various levels: spatial, in terms of mobility (STOP principle), socio-cultural (great diversity of housing forms) and economic (quality and affordability). In terms of building technique, nZEB housing or better within a production-autonomous development has been chosen. The ambition is to become "full electric" by using solar panels and individual heat pumps per unit. A ventilation system with heat recovery will also be applied everywhere. Water use is limited by the construction of centralised wells and the choice of economical toilets, saving showers and taps. On the car-free site there will be charging stations for electric vehicles and the units will all be "domotics proof".

VK also investigated the possibility of using the nearby river for river cooling and together with Eneco the possibility of power walls was explored.

Are you looking for a career at VK?

If you are passionate about design and engineering, show ambition and don’t shy away from a challenge, VK Architects & Engineers can offer you the opportunity to grow and develop your career.

Check out our jobs