USquare is a renovation project in which the old barracks of the National Gendarmerie will become the new accommodation for a university pool for the ULB and VUB. The site positions itself as a new urban area with a collegiate, leading, sustainable, and innovative character.

Challenge

The USquare project is part of a remarkable focus on the existing architectural and heritage value. In addition, the project is centred around sustainable and circular renovation.

Solution

Modular and sectional elements are used as much as possible for the layout and the technical installations. Energy efficiency is enhanced by heat recovery from domestic hot water and daylight detection for lighting.

Read full report

Client(s)

  • Vrije Universiteit Brussel
  • Brussels-Capital Region

Architect(s)

  • evr-Architecten
  • BC-architecten
  • Callebaut

Location

Brussels, Belgium

Timeline

2018

2023

Expertise Team(s)

  • Acoustical Engineering

  • M&E Engineering

  • Structural Engineering

  • Sustainable Design

  • View more...

Design Solution(en)

  • Building Simulations

  • Reconversion Design

  • View more...

USQUARE SE presentatie 180611b 3

Great flexibility for the buildings’ functioning allows for a minimum of material investments in case of any adaptations in the future.

Bram Derudder

project manager buildings, VK architects+engineers

It is the ambition of the ULB, VUB and Brussels Capital-Region to position this site as a Brussels urban and university quarter, offering room for (young) entrepreneurs and facilitating the dialogue between the citizen and the universities. While focusing on sustainability and circular building.

The existing buildings have a remarkable architectural and heritage value. They are part of a walled site, creating an oasis of calm in the middle of the capital. The architectural and structural interventions will occur with respect for the existing volumes, facades and interior. The existing structural bearing capacity is being analysed, and lift and staircase-cores are being adapted. Intermediary volumes, which are not valuable heritage, will be rebuilt.

The buildings’ energetic performance is being optimised through passive measures: insulating facades and roofs where possible, as well as windows and doors. The buildings’ ventilation will function with heat recuperation. Energy efficiency is also maximised through heat recuperation from sanitary hot water, daylight detection for lighting, and by using renewable energy for the primary heat sources.

The client’s high ambitions regarding circular building, are being translated in the overall approach of the project. There will be a maximum use of modular, demountable and reversible elements, both for the interior and for the technical installations. This ensures great flexibility for the buildings’ functioning, and allows for a minimum of material investments in case of any adaptations in the future.

Other projects you might like

Do you want to transform tomorrow with ingenuity, eye for detailed aesthetics, and a sense of responsibility?

Check our job openings!

Would you like to get to know us? Say hi & maybe we will be partners for the long haul.

Made byBits of Love